The city of Dallas requires a finish frame inspection after the wall insulation is installed and before the sheetrock is installed. They also require a final insulation inspection after the ceiling insulation and mechanical HVAC equipment is installed. The energy certification is required by the City of Dallas Building Department before the final Electrical inspection is approved.